This project entails planning, electrical and site work for the installation of (1) Level 2 EVSE dual port charger in the Town's municipal parking lot at Maple Street (see attached site location map). Two locations within the parking lot are being considered for the EV charger. These locations are shown on the attached site plan. There is an existing 100-amp electrical service, also shown on the site plan, that currently services the parking lot's LED lights. The town seeks recommendations as to whether this service should be upgraded at this time for the planned dual port Level 2 charger and possible future additional chargers. The EVSE is to be installed on a permanent concrete base, as per the manufacturer's requirements, and is to be protected with a minimum of two (2) vehicular protective bollards not less than four (4) feet in height from finished grade. Prominent signage identifying the EV charging station is to be installed at the entrance to the parking lot.