Specifications include, but are not limited to: SPECS FOR BOTH FENCES: ALL high and low points need to have a post. There will be an H-brace installed every 660 feet and a line boss (2 7/8” OD) installed every 330 feet. All vertical pipe will be secured with appropriate braces. Line bosses and corner posts on fence line turns of 30 degrees or greater will be supported by H-braces. Single braces may be set perpendicular to the inside of line turns less than 30 degrees. Anchors and/or wire mesh skirting will be used in areas of uneven or rocky ground and secured with anchors or pins. To ensure that the fence excludes ungulates, the bottom of the woven wire will ideally be flush to the ground. If the contractor has an alternate means of securing skirting, then consultation should be provided to the Contract Administrator.