Scope of Work consists of relocating existing conduit to new Unistrut installed vertically on Capstan Mooring Dolphins 2, 3 and 4, and the Loading Platform; installing steel pedestrian guardrail, concrete bull rail and chain rail. More particularly, demolishing existing cable tray on Capstan Mooring Dolphin 4 and north side of the Loading Platform; disconnecting existing cable runs at end devices on Mooring Dolphins 2,3, and 4 and the Loading Platform; furnishing and installing vertical Unistrut support members and new fiberglass conduit along Unistrut on mooring Dolphins 2,3, and 4, and the Loading Platform, routing existing cables in the new conduit and reconnect to original landing terminals; furnishing and installing steel pedestrian guardrail along breasting and mooring Dolphins, and chain rail where shown; installing concrete bull rail along breasting and mooring Dolphins where shown.