Specifications include, but are not limited to: A. Demolition: Existing fixtures are to be removed in sections and replaced with new fixtures in a manner that provides light in the materials management space to continue operations during this project. B. New Construction: Reference Appendix B for site specific drawings. Lithonia ZL1N LED fixtures are basis of design as they match fixtures in CAIHC Bldg B materials management space and provide desired illumination for the space. C. Inspections a. A substantial completion inspection shall be performed by TCC. One-week minimum notice is to be provided prior to inspection date. D. Product Data and Schedule: Within 7 days of the Notice of Intent to Award, the Contractor is responsible for providing product data intended for use on the project and communicating schedule for completion of work based on procurement of the required materials. E. Close-Out: Contractor will provide O&M data as applicable to fixture and materials and provide any onsite owner training required to operate and maintain the equipment safely and effectively.