Specifications include, but are not limited to: 4.2.1.1 Shop Drawings – The Specialty Contractor shall demonstrate its approach for creating the self contains, self-regulated casework that will be located outdoors throughout the year addressing weather conditions such as temperature, humidity, UV, moisture, and cold. 4.2.1.2 Fabrication Drawings – the Specialty Contractor shall demonstrate the understanding to create appropriate fabrication drawings from the conceptual design deck (WV Outdoor Exhibit Artifact Design Intent, dated March 6, 2024) provided by the creative design team. 4.2.1.3 Mock-ups and approval of the components – the Specialty Contractor shall discuss the mock-up process and how to achieve approval from the design team to proceed with fabrication. 4.2.1.4 Fabrication of the components – the Specialty Contractor shall demonstrate its capability to properly and safely fabricate the approval scope of work through its expertise and history. 4.2.1.5 Proper scheduling and sequencing of placement as it relates to the General Contractor’s scope of work – It is essential that the Specialty Contractor thoroughly understand the General Contractor's project schedule and sequence production of shop drawings, fabrication drawings, mock-ups, and fabricate its scope of work to support the project schedule.