Specifications include, but are not limited to: The following is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. Camp Ripley Building 2-202: Replace existing steam heating system with a hot water boiler plant heating system. This work includes changing out air handler heating coils and variable air volume terminal unit reheat coils. In addition, this building will receive a new upgraded Building Automation Controls System. Camp Ripley Building 2-203: Replace existing steam heating system with a hot water boiler plant heating system. This work includes removing an existing shell and tube system to hot water exchanger and installing a new hot water boiler plant. In addition, this building will receive a new upgraded Building Automation Controls System.