The project consists of “Alterations", including HVAC and Electrical upgrades. The facility will have an all new heating, ventilating, and air conditioning (HVAC) systems and associated energy management control systems, the upgraded Electrical system will have a new service panel and associated distribution panels for the new equipment. The project shall comply with the State of Connecticut Office of School Construction Grants Guidelines for school construction projects. The commissioning process shall be an integral part of the building project in accordance with the High Performance Building Construction (HPBC) Standards for State funded buildings as required by Section 16a- 38k of the Connecticut General Statutes and further defined by the Connecticut Building Standard Guidelines Compliance Manual for High Performance Buildings most current version and prepared for the Connecticut Office of Policy and Management. The commissioning process shall include but not limited to the following systems: (1) HVAC systems and associated energy management control systems including air conditioning, and refrigeration systems associated controls ; (2) Newly upgraded Electrical system.