Specifications include, but are not limited to: Contractor shall provide all necessary expertise, labor, equipment, materials, incidentals, and permits required to complete the Project as more fully described in the Contract Documents, including: 1. Select grubbing of the existing water line alignment within the easement. 2. Install erosion control. 3. Excavation and trenching, directional drilling to grade. 4. Installation of all HDPE water line piping, valves, tees, elbows, meters, and associated appurtenances. Minimum water line depth shall be 36 inches. The new water line for ODFW will be continuous from water storage tank to existing valve box location as noted on the plans. The water line for Summer Lake Resort will be continuous from the storage tank to the existing valve location as noted on the plans. This line will also have a tee installed for water service to two residences. 5. The existing water line will be capped left in place. Decommissioned only after successful testing of the new water lines. The Work to be performed under this Contract shall consist of furnishing tools, equipment, materials, supplies, and manufactured articles and for furnishing transportation and services, including fuel, power, water, and essential communications, and for the performance of all labor, work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents.