Mill Street: S. A Street to Centennial Boulevard (Springfield) Project on Mill Street in Springfield. FAP No. 6960(053). ($ 10,000,000 - $ 20,000,000). Req. approx. 1,106 ft2; 4 ea. PCMS; 1,000 hr flaggers; 14 ea. const. entran.; 124 ea. inlet prot.; 1,555 ton contam. soil disp.; const. surv. work; 19,880 yd3 gen. exc.; 1,050 yd2 subg. stab.; 14,299 yd2 subg. geot.; 3,976 ft. rehab. pipe; 16,415 ft mainline video inspect.; 2,743 ft san. sewer pipe; 5,884 ft storm sewer pipe; 16 ea. conc. san. Sewer MH; 22 ea. storm sewer conc. MH; 41 ea. catch basins; 22 ea. connect to extg. str.; 18 ea. fill abandoned str.; 7,437 ton aggr. base; 490 ton ACP; 31 ea. asph. appr.; 1,573 yd2 reinf. conc. pvmt.; 12,726 yd2 plain conc. pvmt.; 932 yd2 flex. to rigid pvmt. trans.; 9,711 ft conc. curbs; 10,844 ft. conc. drvwys.; 51,826 ft2 conc. walks; 92 ea. curb ramps; 1,250 ft2 trunc. domes; 7 ea. speed humps; 5 ea. raised conc. x-walk; 15,327 ft2 colored conc. bikeway; 398 ft2 grouted durable rock; 21,300 ft thermo. striping; 65 ea. pvmt. legend; 2,500 ft2 pvmt. bar; 1,565 ft2 green bike lane film; 630 ft2 signs; pole foundations; lumin., lamps, ballast; switch., conduit, wiring; lighting poles and arms; 2 ea. traffic sig. mod.; ornamental poles and lumin.; 27 ea. water qual. str.; 2,060 yd2 lawn seeding; 675 yd3 topsoil; 140 ea. trees; 110 ea. shrubs; 1,130 ft root barr. Completion Time: October 31, 2025. Classes of Work: Either: A) Earthwork and Drainage, or B) Portland Cement Concrete Paving