Specifications include, but are not limited to: Contractor to Clean, surface preparation & repaint per coatings manufacturer & project specifications. Contractor shall be responsible for hazmat testing, and shall include the price for testing in the base bid. Abatement will be executed through a change order Contractor to include painting as quantified on the attached proposal sheet Base Bid: Paint all assets identified in the attached proposal sheet. Hazmat testing shall be included (excluding abatement) Paint color schema subject to change. Waimea Canyon Lookout: •Paint comfort station #1 (ADA): building interior CMU walls & ceiling (Traditional Tan), stall doors, exterior fascia & soffit (Heartwood Brown) •Paint comfort station #2 (Men’s) building interior CMU walls & ceiling (Traditional Tan), steel security door, entry door, stall doors, exterior fascia & soffit (Heartwood Brown)- repaint exiting “Kane-Men” on front fascia board. Clean & treat 2 Ohia support posts. •Paint comfort station #3 (Women’s) building interior CMU walls & ceiling (Traditional Tan), steel security doors, entry doors, stall doors, exterior fascia & soffit (Heartwood Brown)- repaint exiting “Wahine-Women” on front fascia board. Clean & treat 3 Ohia support posts. •Paint complete look out pathway handrail system (including HI 5 panels installed onto railing to & at lookout) color: Copper Verde Green