Demolition of existing Early Education Center (EEC); Podium Level landscaping, including trees, planters, lawns, soils, etc.; lighting; drains and drain lines; existing waterproofing; etc., and replacement/addition of waterproofing; expansion joints; lighting; drains and drain lines; structural repairs; new soils; landscaping; complete as indicated on the plans and as specified herein. 2. 1000 linear ft Crack Repair, including surface preparation, installation of epoxy, in place complete $____.__ / linear ft. $________.__ 3. 45,000 square ft Spall Repair, including demolition, repair or replacement of corroded reinforcement, surface preparation, forming and pouring of patching material, in place complete $____.__ / square ft. $________.__ 4. 2,000 square ft Leveling of significant ponding areas on structural deck $____.__/ square ft. $________.__ 5. 5 each Removal and disposal of unforeseen subsurface area drains uncovered during excavation, including patching of deck penetrations. $____.__/ each $________.__ 6. 100 linear ft Removal and disposal of unforeseen storm water drainage lines uncovered during excavation. $____.__/ linear ft. $________.__ 7. 100 linear ft Removal and disposal of unforeseen sewer lines uncovered during excavation $____.__/ linear ft. $________.__ 8. 1,000 square ft Removal and disposal of asbestos containing waterproofing $____.__/ square ft.