Specifications include, but are not limited to: • Contractor shall remove, demo, and dispose of all existing concrete per Alabacks Designs Demo plan on sht. L1.00 detail A. Contractor shall follow all Demolition notes per sht. L1.00. • Contractor shall provide and install a construction safety fence surrounding the work area. • Contractor shall provide their own dumpster for disposal of all construction debris. • Contractor shall provide and install new concrete per plans and notes per Alaback Designs sht. L1.00 & L3.00. • Contractor vehicles cannot be parked in front of the Welcome Center. Tools and materials can be unloaded by the area of the work but once unloaded all vehicles will have to be moved away from the entrance. The parking spaces on either side of the entrance and by the flags should be left open for visitors. • Contractor shall provide and install new irrigation to the area per Alaback Designs landscape plan and notes per sht. L4.00. New Irrigation line will be bored under the concrete per plan sht. L4.00. Add 1 additional 2” conduit for future use. • Contractor shall provide and install new landscape bed and plantings per Alaback Designs landscape plan and notes per sht. L4.00. • Contractor is allowed to use the restrooms in the Welcome Center. • Contractor shall always maintain a clean and orderly jobsite.