Specifications include, but are not limited to: 1 1 LS Clearing and grubbing, as specified and/or shown on the construction documents, complete, in place and accepted by the owner $___________ $___________ 2 9924 CY Unclassified excavation, as specified and/or shown on the construction documents, complete, in place and accepted by the owner. $___________ $___________ 3 34 SY Subgrade preparation, as specified and/or shown on the construction documents, complete, in place and accepted by the owner. $___________ $___________ 4 15 CY Structural concrete, class a, as Specified and/or shown on the construction documents, complete, in place and accepted by the owner. $___________ $___________ 5 1 AL Removal of structures and Obstructions, as specified and/or Shown on the Construction Documents, complete, in place and accepted by the owner. $___________ $___________ 6 3 AC Temporary soil stabilant, as specified and/or shown on the Construction Documents, complete, in place and accepted by the owner. $___________ $___________ 7 1 LS NPDES permitting and maintenance, as specified and/or shown on the construction documents, complete, in place and accepted by the owner. $___________ $__