Specifications include, but are not limited to: This project consists of additions and improvements to the Airport Water Reclamation Facility dewatering operations including the addition of one (1) new building, two (2) dewatering units, and one (1) 1M-1.5M gallon solids holding tank. The current water reclamation facility does not have the capacity and redundancy for centralization. Current solids storage capacity is insufficient for storing solids more than one day without the need for dewatering. The current solids centrifuge, that dewaters and loads solids into roll-off containers to be hauled away each day, is not capable of keeping up with the increased flows from centralization and there is no backup to the current solids centrifuge dewatering and loading system if the primary equipment needs maintenance or fails. The project scope of work includes evaluating the cost-benefit of options for the proposed improvements including operations and maintenance requirements and costs, ease of integration into current facility operations and processes, current and future benefits, and drawbacks to the placement of new infrastructure, and ease and impact of future expansion and improvements.