Specifications include, but are not limited to: The work to be done consists of furnishing all materials (excluding the 12-inch force main PVC C900 (DR18, Class 235) pipe), equipment and labor for the construction of: Construction of approximately 11,780 L.F. of 12-inch force main, 2,260 L.F. of 12- inch fusible PVC by slip-line, 2,990 L.F. of 12-inch fusible PVC by directional bore, 685 L.F. of 12-inch ductile iron force main, 1,761 L.F. of 16-inch fusible PVC casing by directional bore, 390 L.F. of 16-inch steel casing by jack and bore, 13 combination vacuum and air release valve manholes with appurtenances and storm water monitoring. Time allotted for this work is 330 consecutive calendar days for substantial completion and 360 days for final completion.