Specifications include, but are not limited to: The scope of services for the engineering services outlined above will include the following: 1. Design of the Broad River Waste Water Treatment Plant Improvements, based on the preliminary engineering report produced by Black & Veatch Engineering in June 2022. A copy of the preliminary engineering report and most recent collection system design drawings can be found on our website at https://www.gbpw.com/project-gateway-resources 2. Bid services for the WWTP Improvements. 3. Construction management services for WWTP Improvements. Construction schedule is tentatively scheduled for September 2024 through March 2026. At minimum, firms should anticipate 1 full-time inspector available for the entire construction schedule. 4. Project Closeout Services Record drawings for the WWTP Improvements, as well as all necessary permit requirements to operate and close out of the construction phases.