Specifications include, but are not limited to: Washington County is requesting quotes for a fence, railings, signage, and bicycle infrastructure installation and repair services contract for Washington County Facilities Division. A. Contractor shall furnish all labor, materials, permits, equipment, tools and all other items necessary for and incidental to executing and completing the work. At times the County may choose to furnish materials such as signage or bicycle infrastructure. B. Permits: Washington County does not foresee a need for any permits relating to work. If at any time during the contract a project requires the contractor to obtain a permit before beginning work, the County will pay for the permit by reimbursing the contractor for the cost of the permit (no markup is allowed) and administrative expenses related to acquiring the permit. C. If permits are required to accomplish the work for the County, the Contractor shall invoice the County the cost of the permit fee without mark-up. D. Traffic Control: At times it may be necessary to block all or part of a lane of traffic or a sidewalk to complete work associated with this contract. All flagging must be done in accordance to state and local laws. E. Contractor will be responsible for all underground utility locates associated with any excavation or post-driving required for their work. F. If private locates are required for the work, the contractor is allowed to charge the County 15% mark-up for the locating service. G. The contractor will work with County to have property lines surveyed with required for their work. H. The Contractor shall at all times keep the premises and adjacent areas free from accumulations of waste materials or rubbish. At the completion of the work, they shall remove all rubbish, tools, and surplus materials from the premises and adjacent areas and shall have the area clean and ready for use. I. In case of a dispute, Washington County may remove rubbish or otherwise clean up, and may charge the Contractor either by deduction from amounts unpaid to the Contractor. J. If the County hires an additional contractor to complete the work, the County will charge an amount equal to the reimbursement of costs plus incurred by the County plus a percentage markup for administrative costs and county personnel. K. If County personnel performs the work the Contractor will be charged for County time and materials used. L. These charges will be defined by the County and the Contractor after the solicitation has been awarded.