Specifications include, but are not limited to: The City is seeking the services of a contractor to provide roadside right-of-way mowing services in various areas of the City. Work under this project will include: A. Successful Contractor will mow approximately 30,000 linear feet of right of way with an average width of 15 feet to a height of between four (4) and six (6) inches. Requested services will also cover 4,500 square feet area on 72nd near Pacific Hwy. B. Successful Contractor will mow a minimum of five (5) times and maximum of six (6) times annually. C. Mowings will be done from the City of Tigard’s location list (Attachment C), map will be provided to the successful contractor. D. Mowings will be completed an on-call basis and Contractor shall respond to City’s call within five (5) days of requesting a mow. E. Successful Contractor will include weed eating around all post in the areas that are being mowed. F. Successful Contractor must supply all equipment needed to mow and weed eat the areas specified. G. Successful Contractor will be responsible for supplying all traffic control equipment needed, including all signs, cones, and, if required, flaggers.