All correspondence must be made through the Vendor Portal. Install bottle filler unit water cooler to include labor, material, for electrical and or plumbing that may be required. Location: Lee County Health Department 1801 Corporate Drive Opelika, Alabama 36801 Demolition and proper disposal of existing water fountain dual unit, Sunco WF Model # NWCALLRPewter, non-filter (1996). Installation of owner provided Elkay Enhanced ezH20 Bottle Filling Station and Versatile Bi-Level ADA Cooler Refrigerated Stainless High Capacity Lead Reduction Quick Filter Change Model LZSTL8WSSP in accordance with manufacturer's instructions and to comply with all local building codes and ADA regulations. Work Includes: Demo existing water cooler. Provide and install all necessary plumbing fittings, supply lines and drain lines. Install one owner provided filtered water bottle filler. If needed: Relocate the existing electrical to accommodate the new equipment.