All correspondence must be made through the Vendor Portal. For the service of Annual Inspection and Testing of Fire Sprinkler Systems and Automatic Fire Alarm SystemsInspections and diagnostic tests for the accessible fire sprinkler devices listed and currently connected to fire sprinkler systems.Wet System Test & InspectTo include Tamper, Flow, Gate Valve, Fire Dept. Connection Plastic Caps, Valve Trim & Main Drain ValveQuantity: 5Location:Bullock County Correctional 104 Bullock Dr.Union Springs, AL 36089See attached Scope of Work for detailed specifications.Awarded supplier must be able to complete inspections within 21 calendar days after receipt of order and issue a written report of findings within 5 days after the inspection(s).To be invoiced in arrearsAward will be made “ALL or NONE” to the lowest responsive and responsible bidder meeting all specifications. Supplier must bid each line or response will be rejected.