The removal and disposal of petroleum impacted soil, including, but not necessarily limited to, the disconnection and removal of any above ground and underground utilities prior to soil removal, the removal of concrete from above the petroleum impacted soil [The shallow depth of the proposed area of excavation indicates that removal of shallow petroleum impacted groundwater will most likely not be necessary at the site. . In addition, Non-Aqueous Phase Liquid (NAPL) was not encountered during drilling activities.], the removal and disposal of all petroleum impacted soil, backfilling and compacting clean fill into the excavation, the installation of approximately two inches crushed stone on top of the clean compacted fill, capping of the excavated area with six inches (6”) of asphalt. The successful bidder will make all arrangements for the disposal of all the excavated soil in a Class II Landfill. Copies of all disposal manifests will be supplied to WWCS and AEG at the conclusion of excavation activities.