Specifications include, but are not limited to: PROJECT NO. 222307 INSTALLATION OF NEW STREET LIGHTS - This project involves the installation of new streetlights along Olive Avenue, spanning from N 59th Avenue to N 67th Avenue. Asphalt and concrete trench removal and replacement, conduit installation, new pole foundations, pole installation, luminaire placement, push button installation and striping. PROJECT NO. 222308 TRAFFIC SIGNAL UPDATE. The project involves comprehensive upgrades to the traffic infrastructure located at Olive Avenue and 61st Avenue, including removing and replacing some of the existing traffic signal poles, mast arms, and their foundations. Pull boxes, signal cabinets, and their respective foundations will be removed and replaced. Removal of detector loop lead-in cables, loop abandonment, and the relocation of the video detection system. Sections of the sidewalk, curb, and gutter will be removed and relocated with directional ADA ramps, followed by the necessary patching and slurry seal.