Specifications include, but are not limited to: The contractor shall supply all cameras, mounts, pendants, labor, materials, and software for a complete functional system. It may include installing camera mounts, cameras, cabling, conduit, surface molding, raceway, wire, faceplates, boxes, modular jacks, screws, patch cables, and labor related to the installation. The contractor providing the bid must perform the work and not be subcontracted. UFA technology will provide a server and storage as outlined to meet software requirements. Storage will be to hold and retrieve 60 days of camera data. 1. Each data drop consists of 2 separate data lines. Please refer to the materials provided at the mandatory pre-bid walk-through meeting. 2. Boxes should be located inside the building for outside camera installations. 3. Exact locations will be determined by the UFA Technology Division and provided to each Contractor in the Bid Walk Meeting listed above. 4. Install and set up 9 exterior cameras, 12 interior cameras, and 2 lights and signs at the site listed above. 5. Testing, documentation, and warranty of the installed data cables and cameras are required. 6. UFA will provide all cameras with Power over Ethernet Switch Ports. 7. UFA will provide all CAT 6 Patch Panels. 8. Configuring the cameras to the appropriate server, focusing, and directing the cameras will be a joint effort of UFA and the selected Contractor. 9. Each camera location will have a data drop consisting of two data lines home-run to the nearest rack location. Please reference the materials provided at the mandatory pre-bid walk-through meeting. 10. Locations where cameras are being replaced or using existing wiring may have to repair bad or non-working cables or ends. If a new wire pull is necessary, we would add that to the contract...