Specifications include, but are not limited to: (1) Project consists of the construction of partial renovation of the 8th floor of the Patient Care Tower as well as utility and infrastructure work in the penthouses and on the roof. A duct bridge and enclosed duct chase on the roof to contain new ductwork are part of the work. The area to be renovated with in patient care areas is 2,114 square feet. (2) Demolition shall consist of the existing finishes within the patient care area. Also demolition of portions of select metal panels on the exterior walls of the penthouses to allow the installation of new duct work. Saw cutting to remove a portion of the existing concrete roof deck is required to allow for the new ducts to be traverse to the ceiling space of the 8th floor below. An existing med gas zone valve will need to be removed to accommodate the installation of new door. (3) Architectural work shall consist of new finishes in the patient care areas, moving an existing door, and erecting a new partition to separate the BMT space from adjacent patient care areas. Other work includes new metal panels for the pipe bridge enclosure and duct chase enclosure on the roof. (4) Structural work shall consist of new structural steel for the new duct bridge and chase. (5) Mechanical work shall consist of a new air handler in the penthouse as well as new associated duct work. Additional work will consist of duct work modifications to connect the new duct feed to the existing ducts. The new AHU will be tied into the existing chilled water system in the existing penthouse. The med gas zone valve will be installed in a new location. (6) Electrical work shall consist of installing new electrical panels and associated VFDs. Other work will include modifications to lights and electrical conduits to coordinate with the new work.