This Project will repair and resurface approximately 9.56 miles on 7 roads in Mitchell County including Gravel Hill Road from the Dougherty County Line going south for approximately 1.47 Miles, Pine Cone Road from County Line Road to End (1.15 Miles), Jackson Dairy Road from Stage Coach Road to S.R. 112 (2.07 Miles), Stage Coach Road from Tuton Road to Delta Pine Road (1.29 Miles), Greenough Road from S.R. 93 to the Colquitt County Line (1.66 Miles), Stage Coach Road from Harmony Road to S.R. 111 (1.73 Miles), and approximately 1,000’ of New Hope Road (0.19 Miles). The scope generally consists of 315.1 TONS of Road Patching by milling existing road and replacing with 4” of 19 mm Superpave Asphalt, 57,675 SY of Full Depth Reclamation on 6 different Roads, 5,731 TONS of OGI as leveling, 110,195 SY of Double Chip and Sand Seal Surface Treatment, and 195 TONS of Asphalt Resurfacing. Project also includes traffic control, shoulder clipping, tack coat, primer, striping, shoulder restoration along with any other related accessories and appurtenances as shown on the Drawings and called for in the Contract Documents.