Specifications include, but are not limited to: 1. Contractor shall be responsible for providing all materials, supplies, equipment, tools, and labor required for removal and replacement of suspended ceiling tile in (Unit 1) and (Unit 2) administrative offices, hallways, multi-purpose rooms, day areas and the main hub area at the Chatham County Detention Center. UNIT 1: (approx. total of 15,394 sf.) (a). As per layout in Unit 1 floor plan provided. UNIT 2: (approx. total of 21,699 sf.) (a). As per layout in Unit 2 floor plan provided. 2. Contractor shall examine the conditions under which the suspended ceiling tile work is to be performed and shall immediately notify the Project Manager of any unsatisfactory conditions so that they can be corrected prior to commencement of work. 3. Contractor will be solely responsible to complete a final cleanup of the areas, remove, and dispose all debris. FLOOR PLANS: 1. Measurements and square footage are highlighted. PREPARATION: 1. Preparation shall include cleaning ceiling grid surface for installation. 2. Re-paint existing grid. 3. Repair any damaged grid as needed. (Unseen repairs approx. total of 25ft.) INSTALLATION: 1. New suspended ceiling tiles shall be installed per manufacturer's instructions and recommendations. 2. Contractor will be responsible for all repairs during warranty period. 3. Provide six (6) cases of matching USG Radar R2110 ceiling tiles for stock...