Specifications include, but are not limited to: On Oilwell Road this project will involve, but is not limited to, Remove 40 LF cross culver @ MP 3.3 of Oilwell Rd. (12” CSP), remove and replace 30 LF cross culver @ MP 4.2 of Oilwell Rd. (18” CSP), remove and replace a 40 LF cross culver @ MP 4.8 of Oilwell Rd. (18” CSP), remove and replace a 40 LF cross culver @ MP 5.0 of Oilwell Rd. (18” CSP) and install 60 LF cross culver @ MP 11.75 of Oilwell Rd (24” CSP). Culverts @ MP 3.3 gets a 1-foot lift 100 feet each side of the culvert, @ MP 4.2 get a 1-foot lift 25 feet each side of the culvert. Culverts @ MP 4.8 (530 linear feet) & 5.0 (170 linear feet) get a 1- foot lift across the swamp where the culverts are located. The culvert @ MP 11.75 gets a 2-foot lift over the culvert for 150 linear feet. Construction on South Oilwell Road and East Devonshire Drive shall be completed in accordance with the Alaska Department of Transportation and Public Facilities (DOT&PF) Standard Specifications for Highway Construction (SSHC) 2017 Edition. For Standard Specification 101 through 120, the Alaska Department of Transportation and Public Facilities Standard Specifications for Highway Construction 2017 Edition and The Standard Modifications for Oilwell Road and Devonshire Drive govern. Project specific special provisions are provided in the following sections. The requirements contained in these specifications and special provisions are hereby made a part of this solicitation and resultant contract.