Specifications include, but are not limited to: removal for maintenance and construction of roadway to include an area of asphalt surface for maintenance of soft spot, the repair of a bus turn-around area, Roto milling of approximately 3500 sq yards of bituminous surface and resurfacing that segment of roadway with an asphalt surface. The Project will also require shoulder widening to accommodate pedestrian walkway, and the placement of a chip seal on the project. Project will include additive alternate bid items that will be chosen based on the availability of funds. This work shall consist of furnishing all labor, material, and equipment necessary to perform all operations for the maintenance of the specified roadway.