Specifications include, but are not limited to: The intent of these specifications is to describe the work necessary to: Complete the removal of the collapsed bridge and associated stream bank restoration. The Contractor shall supply all materials, labor and equipment necessary to properly perform the respective items of work. Any apparatus, material and labor not specifically mentioned or shown on the Contract Drawings which may be found necessary to complete or perfect any portion of the work in a substantial manner and in compliance with the requirements implied or intended in these specifications shall be furnished by the Contractor without additional compensation. This shall include all materials, devices and methods peculiar to the apparatus or system furnished and installed by the Contractor.