Specifications include, but are not limited to: This project involves stormwater infrastructure improvements located at Overton Drive NE and Balboa Court NE in the Oakridge Forest Subdivision in Sandy Springs, GA. The project involves the cured-in-place pipe (CIPP) lining of approximately 231 LF of 18” diameter corrugated metal pipe and 445 LF of 30” diameter corrugated metal pipe. All associated work required with CIPP lining, including but not limited to, pipe cleaning and flushing, pre and post TV inspection and videography, liner installation, water for inversion, disposal of water, pipe gaskets (end seals), testing of liner, and cure tracking, as outlined in the CIPP Specifications within the planset, is included in the scope of work. Traffic maintenance will be required, and homeowner property access will need to be maintained. During construction, one lane of road shall remain open at all times unless otherwise approved. Utility locates necessary for project completion shall be the responsibility of the contractor.