Specifications include, but are not limited to: Thecollection, and/or update to current GIS Utility Network Schema, of all overhead and undergroundelectric assets including, but not limited to:•Update/Migrate Poles to UN Structure Network1.Pole Height2.Verify coordinates3.Pole condition4.# of communications attachments•Update/Migrate OH and UG Transformers to UN Electric Network with associations1.kVA rating2.Secondary Voltage3.High side voltage, 12,470 or 7,2004.Structural attachments5.OH or Pad Mount•Update/Migrate Street Lights1.Wattage2.LED, or other•Update/Migrate OH and UG Primary lines1.Wire Size and Material for OH lines2.Wire size for UG lines3.Phase Connections•Map OH and UG Secondary lines1.Wire Size and configuration (Duplex, Triplex, Quad)2.Voltage•Map OH and UG service lines1.Wire Size and configuration2.Voltage3.Connection point, (pole, transformer, vault, pedestal)•Primary and Secondary Service meters1.Accurate Location•Capacitors (We only have four or five installations)•Fuses and Switches1.Type2.Current State3.Operator