Specifications include, but are not limited to: The project limits are from Columbia Drive to Wesley Chapel Road. SR 155 (Flat Shoals Parkway) is a four-lane divided highway with curb and gutter on both sides for most of the project limits. The remainder of the roadway is a five-lane section with curb and gutter on both sides. There is intermittent existing sidewalk on both sides of the road. The existing speed limit is 45 miles per hour. The project will involve adding sidewalks to fill the gaps and create continuous sidewalk on both sides of the road for the entire length of the project. The project will also include upgrading the existing sidewalk, where needed, to meet current ADA standards. A protected mid-block crossing is proposed near Flat Shoals Park. The Consultant shall provide an approved concept report, preliminary construction plans, signing and marking plans, signal plans, bridge plans, final right-of way plans (including revision), erosion control plans, staging plans, and final construction plans (including revisions through project final acceptance). All required engineering studies are considered part of the scope of services. All deliverable shall be in accordance with but not limited to the Plan Development Process (PDP), Electronic Data Guidelines, Plan Presentation Guide , NEPA and the GDOT Environmental Procedure Manual, GDOT Design Policy Manual, GDOT Drainage Manual, and the GDOT Bridge and Structures Design Manual,. A draft concept report exists under PI 0015061.