Specifications include, but are not limited to: Lump Sum Base Bid to furnish all materials, tools, Equipment & Labor, etc for complete Project.; Rock excavation by means of blasting ($60 per cubic yard, maximum. The Company shall pay a maximum of $60.00 per cubic yard of rock removed by means of blasting.); Rock excavation by mechanical means ($125 per cubic yard, maximum. The Company shall pay a maximum of $125.00 per cubic yard of rock removed by mechanical means.); Furnish and Install 6" diameter PC-350 ductile iron water main utilizing traditional trench installation techniques, complete - In pavement; Furnish and Install 6" diameter PC-350 ductile iron water main utilizing traditional trench installation techniques, complete - In sidewalk; Furnish and Install 6" diameter PC-350 ductile iron water main utilizing traditional trench installation techniques, complete - In lawn; Furnish and Install 8" diameter PC-350 ductile iron water main utilizing traditional trench installation techniques, complete - In pavement