Specifications include, but are not limited to: RESTORATION Description of Work PHASE I Contractor will be responsible for thoroughly cleaning and restoring the units to the pre-fire condition. PHASE I Contractor is responsible for thorough cleaning of all materials, in all four units including but not limited to, floors, walls, cabinets, doors, trim, plumbing, electrical fixtures, appliances, windows, etc. NOTE: These four units will require new materials overall, the Authority still requires contractor to clean unit. PHASE I Contractor will be responsible for odor control by removing, cleaning, scraping away and/or by any means deemed standard of the trades of all burned wood and/or materials. PHASE I Shellac seal all exposed and/or remaining framing members (damaged or not) by any method and/or process acceptable in the industry to ensure that no odor is detected after restoration has been completed. PHASE I Pressure wash with an environmentally-safe chemical spray all exterior walls, soffit and entire patio covers. This includes the complete exterior surfaces of the entire building. PHASE I Contractor to perform water extraction/remediation for units, as needed. PHASE I Contractor will be responsible for mold and/mildew remediation, if present. IV. FRAMING Description of Work PHASE I/II Replace and/or repair damaged framing materials, with new materials, to match existing materials, to proper size and type to meet all building codes and engineering requirements. If acceptable methods of sister trussing are recommended by the Engineer and/or approved by City of Dos Palos Building Department and meets all code requirements, then this will be an acceptable method of repair instead of replacement of framing members.