Specifications include, but are not limited to: Surface Damage and Cracking Repair the area of delamination in the South “D” zone, near Location 2. Fill the hole in the west “D” zone near Location 3. Fill the linear gouge/hole in Lane 1, near Location 7. Fill the linear cracking in the black track coloring at the inside edge adjacent to Lane 1, between Locations 7 and 8. Fill the crack in the bituminous pavement adjacent to the outer edge of the track near Location 8 up to the edge of the track surfacing. Fill the linear cracking in the black track coloring at the inside edge adjacent to Lane 1, between Locations 8 and 1.; Drainage System Repair the broken slot drain section near Location 4 by adhering the top section to the base at the two horizontal connectors and top edge of the drain body. Repair the broken slot drain section between Location 5 and Location 6 by adhering the top section to the base at the two horizontal connectors and top edge of the drain body. Repair the broken slot drain section between Location 8 and Location 1 by adhering the top section to the base at the two horizontal connectors and top edge of the drain body.; Water Service Boxes Remove infill and turf carpet to gain access to water service box. This may require cutting and re-seaming of the turf, which should be done by a qualified contractor, so warranties are not affected. Remove field base material around water box as required to remove existing box and create space for new installation. Install free draining stone base or other base type called-for by the box manufacturer. Install the box in accordance with manufacturer’s instructions set to maintain planarity of the field surface across the location. Re-install turf carpet to form level surface with box cover and replace infill. Secure turf material to box cover in accordance with manufacturer’s instructions.; Fill the linear cracking at the western portion of the south “D” zone parallel to the end of the synthetic turf field. Fill the numerous small holes (surface damage) observed in the south “D” zone west of the field centerline, near Location 3. It is recommended that the school modify its procedures for the movement of track and field equipment on the track’s coated areas to prevent future damage. Fill the large, localized surface damage observed in the south “D” zone west of the discus cage, near Location 4.