Specifications include, but are not limited to: 1. Demo existing fiberglass bathtub shower enclosure, shower valve and head/spout assembly. Demo ceramic tile upper surround and above shower soffit. Remove drywall and finishes down to studs for new shower enclosure walls and ceiling area. 2. Provide and install new shower valve assembly and shower head at proper shower elevations. Peerless Precept ADA shower and hand shower PTT24247. Modify existing tub drain as needed for new shower assembly. Increase size to 2” trap and drain. Existing 1-1/2” drain arm is to remain. 3. Provide and install new handicap shower 3 piece remodeler unit. Ensure wood backing is installed for grab bar installation. Salo SED360-30. Options to include no molded shower seat, reinforced for grab bar installation. Left drain. Provide and install Mustee CareGiver 23” wallmount folding shower seat 390.413. Install 1 vertical grab bar on the left side front, and 1 horizontal grab bar across the back wall. Size grab bars to fit the shower assembly. 4. Provide and install new Moen tension mount curved shower curtain rod DN2171CH. 5. Provide and install new bath fan in the skylight shaft assembly and wire to connect to the existing bath fan, Broan 70 CFM (671). Exhaust through roof. Install new roof vent cap and ensure it is properly sealed in the roof shingle assembly. Ensure housing assembly in attic is sealed and insulated. 6. Install new drywall finishes, tape, texture and paint, including bathroom ceiling, walls and skylight chase, including sealants where required.