Amtrak is accepting Letters of Interest for Construction Services in support of the Seattle Maintenance Facility Track Improvements Project in Seattle, WA. Amtrak, at its sole discretion and without discussion, will determine which Contractors are to be added to its short list for the forthcoming Invitation to Bid (IFB). The Contractor shall be responsible for: Surfacing - CP King interlocking Seattle, Lead Tracks 1, 2 & 3 three double crossovers 15 switches, plus Seattle Yard tracks. Surface, regulate 30+ switches, 15,000+ ft of track restore established walkways. Require production tamper, regulator, and qualified surfacing crew. All equipment must meet Amtrak and FRA standards for on track equipment. All work must comply with Amtrak’s MW1000 track standards for class II track. Switch Roller and Target Install – Install 42 Ekoslide Switch Rollers (provided by Amtrak) into all yard switches. Install new switch targets (provided by contractor) on all yard switches. Period of Peformance Contractor to provide a detailed work schedule to include the number of days to complete the work. Work Restrictions Monday-Friday (excluding holidays) Average of 7 ½ hours per day between 7:00 am and 3:00 pm Anticipated Work Timeframe: Amtrak would like work to begin ASAP.