• Epson Brightlink 760 Wi WXGA 3LCD Interactive Mfg V11HA80020, Ultra Short-throw Projector with all included accessories or better. • Epson preferred plus extended service agreement 1 year on site Mfg EPPEXPB1 • Epson Ultra-Short Throw Wall Mount ELPMB62 Model: V12HA06A05 • Projector remote control • Two interactive pens with two hard tips and four soft tips. • Must include Smart Notebook software • Screen Share (back and forth collaboration) • Casting ability from PCs, MacBook, Chromebook, Android and IOS devices. • Power Cord-not less than 25’ not more than 50’ • HDMI Cable-not less than 25’ not more than 50’ • USB cable-not less than 25’ not more than 50’ • Network Patch Cable-not less than 25’ not more than 50’ • Non Metallic Raceway to hide all cables from projector to destination device. • Installation and configuration -Turn Key solution. • Whether the winning vendor does the installations or hires a subcontractor to perform the work, the installing organization cannot be further than a four hour drive from DeSoto County, or 250 miles. DeSoto County Schools will make every attempt to organize purchases so that as many projectors as possible will be available for installation per trip. If very small quantities are purchased later in the school year the installer must be willing to come back to DeSoto County Schools to perform additional installations during the length of the bid. • At time of installation the length of cable will be determined based upon location of the teacher PC or desk so installers should arrive at the school with adequate quantities of cables of both lengths. • All debris left over from the installation must be cleaned up after the installation is completed. Specifications • After installation of projectors the installing company must complete the Interactive Projector Installation Form (see example included in bid packet) indicating the school’s name, serial number of the projector installed, date installed, and room number. This will allow DeSoto County Schools the ability to track installations and completions. The form should be left with the Bookkeeper at each school after the installation is complete. • Shipping costs must be included in bid price • There shall be no additional contracts issued for installation of projectors