Specifications include, but are not limited to: Provide Labor, Equipment and Material to: Patch, Repair, Sealcoat, and Restripe all asphalt paving at various county owned facilities. Work to include but not limited to: Patch and repair as specified in Section 32 01 17. Prepare and sealcoat as specified in Section 32 01 19. Provide and install pavement markings as specified Section 31 17 23. Note asphalt is to be restriped in its current layout. All cracks in pavement are to filled. Coordinate a preconstruction meeting with the Department Manager prior to commencing the work. Coordinate working times with the Department Manager. Contractor should have equipment and manpower to complete the job beginning on a Friday afternoon and be ending on Sunday night. The owner will be responsible for making sure there are no vehicles remaining in parking lot when project is to start. The contractor to have an employee present at all times that is familiar with these conditions and has the authority to respond to any owner concerns. All equipment is to be in safe and workable condition and operated in compliance with all state and federal regulations. Provide a safe, clear, unencumbered and clearly identified pathway to the entrances at all times. Remove and dispose of all construction debris and containers at the end of each day. Repair or replace any damages by the contractor to walls, roofs, windows, doors, sidewalks, pavement, lawns, landscaping or vehicles. Surfaces to receive coatings are to be cleaned, prepared, and caulked as recommended by the manufacturer. Finishes are to be applied strictly as recommended by the manufacturer. Provide a small test sample in each area or item being refinished. Provide the owner with a minimum ½ gallon, including the mix formula, of each material used in the project. Bidders are responsible for measurements of the parking lot.