Specifications include, but are not limited to: The parking lots depicted in the plan sheets are to be repaired or rehabilitated as indicated by the plan sheets. Each parking lot is to either be restriped, overlayed, crack sealed, and/or sealed. If there is a low spot/depression/base failure identified in the parking lot, a wearing course may be added to help prevent water retention. This item will be for under contingency asphalt for rehab. Restriping shall be completed with paint meeting WVDOH standard specifications and match the existing pavement markings. The following products shall be used for crack sealant and parking lot sealant. Crack sealant shall be Crafco Part No. 34200 or an approved equivalent alternative meeting the same specifications. Pavement sealant shall be completed with Poly CoteTM or an approved equivalent alternative meeting the same specifications. Contractor shall meet all application methods set forth by product manufacturers.