Specifications include, but are not limited to: A. Paint application rate shall be a minimum of 16.5 gallons/mile with a glass bead application rate of 6 pounds/gallon (minimum). B. Parking lot markings are not included in this bid. Individual quotes will be requested as needed. C. All materials and methods of construction (including minimum retro reflectivity requirements) shall meet the 2019 Edition of the Kentucky Department of Highways Standard Specifications for Road and Bridge Construction (including the 9/25/20 Letting Supplemental Specifications). D. Contractor is responsible for traffic control and necessary signage as required by the current edition of the Manual on Uniform Traffic Control Devices (MUTCD). E. Contractor is responsible for removing all loose materials on the road in area of striping prior to striping, especially road edges (white line striping). F. Remove all markings made in error or not conforming to the traffic operation in use. Do not paint with asphalt binder or other material to obliterate the markings. Remove pavement striping, temporary or permanent, from asphalt or concrete pavement using ultra-high pressure water. Do not damage the pavement in any way and protect all joint seals. Repair any damage to the pavement as a result of the marking removal. Removal of marking will not be measured for payment.