Specifications include, but are not limited to: 1. The Main Terminal and airport roadways shall remain operational at all times. Any damages to existing areas caused by the Contractor shall be repaired by the Contractor at no cost to the State. 2. Upon execution of the contract, the Contractor, at their cost, shall obtain all permits required for this project. The work involves the following tasks at Hana Airport in Hana, Maui. 1. Demolition and removal of a collapsed baseyard building and its associated floor slab as well as proper disposal of all waste material 2. Hazardous materials abatement as noted in the hazardous materials report. 3. Removal and/or relocation of various utilities including water and the airfield lighting system. 4. Removal of the baseyard septic tank and sewer system. 5. Filling in the area of the removed slab and septic tank and planting and establishment of grass. 6. Placement of barricades. 7. Any other work not explicitly mentioned in this section, but shown elsewhere in these plans and specifications.