Specifications include, but are not limited to: 1. FACILITIES: The selected contractor shall furnish all necessary labor, supervision, equipment, and supplies required to perform custodial services within the first 30 days of the contract, contractor is required to perform an initial service for all tasks covered by this contract (exterior work may be excluded), contractor and DMVA will set a schedule to complete all the required tasks. 2. TRASH AND REFUSE REMOVAL: All interior and exterior trash receptacles shall be emptied each service and returned to their initial locations. Boxes and papers placed near a trash receptacle and marked "TRASH" shall be removed. All can liners are to be replaced. Trash shall be disposed of in secured plastic bags. Trash shall be kept in a secondary container while inside the building to prevent spills and stains. The contractor shall pick up any trash that may fall onto the facilities grounds during removal from the building. The Department of Military & Veterans Affairs shall be responsible for emptying or collection service of the dumpsters. The contractor is responsible for removing trash and debris from buildings. Trash shall not be left in custodial closets or other areas overnight. In the event a spill occurs, the contractor is responsible for removing stains and spots on surfaces where trash is placed before transportation to refuse dumpsters. These surfaces include carpet, tile, and concrete surfaces. 3. VACUUMING: Must be performed during each service with an electric stand-up vacuum with a beater brush. All carpeted areas are to be thoroughly cleaned. This includes under desks, behind doors and in corners. Upon completion all carpeted areas shall be neat, clean, free of debris, and have a professional appearance...