Specifications include, but are not limited to: 1 Equipment Specifications Cooling tower 1 - Baltimore Aircoil company mod#15160, S#UO64925701; Cooling tower 1 - Baltimore Aircoil company mod#15160, S#UO64925702; Steam boiler - Rite Stream Boiler Mod#P75SG, S#3002; 2 Start-Up and Cooling Tower Cleaning / Sterilization and winter preparation of cooling tower. Cooling Tower cleaning & sanitization to include: Manpower and Equipment: Thorough power washing of distribution deck, tower fill and sump after cleaning. Remove all debris from sump and dispose and sanitize with sodium hypochlorite passivate system with corrosion control chemicals. Spring - before July Fall - before January Note: Power washing is estimated at two men at 8 hours to achieve professional cleanliness. Unit should be free of scaling and debris.