Specifications include, but are not limited to: • Obtain all applicable and trade permits needed from state agencies (RIBCC, etc.) • Demolition and removal of the old cooling tower and piping to roof penetration. • Provide a new all stainless-steel Baltimore Aircoil Cooling (BAC) tower including catwalk with • ladder, and piping. See attached BAC product data & shop drawings. • Include all Electrical power, Siemens control wiring, water treatment system, plumbing, and • insulation scope. • Provide crane, crew, rigging, and safety measures to properly off-load and install roof-top • equipment. o Due to unknow soil conditions the crane must be placed on the pavement with proper dunnage/counterweights/etc. See attached site sketch for additional information. o Barriers and signage must be provided by the contractor to the satisfaction of the User Agency to separate the work area from occupied areas. Appropriate signage, approved by the User Agency, shall be placed at all potential entrances to the Project Site and maintained throughout the project. o The Building and surrounding areas will be occupied during construction. The Contractor shall be solely responsible for initiating, maintaining and supervising safety, security and protection programs and shall comply with all applicable laws, ordinances, rules, and regulations concerning safety of people and the protection of property. • Include all associated material, start-up, commissioning, 1-year warranty, and as-built documentation o Electronic and hard-copies. • Replace all piping from the cooling tower to and including the 90deg elbows just before the piping penetrates the existing roof. • Remove and replace all dunnage supporting the piping with proper code compliant roofing material protection and pipe support. • Work will be performed during normal (7:00am to 4pm) business hours. • New piping to have code compliant insulation and jacketing. • Provide water hose connection and valve (similar to existing) providing RIC Facilities with the ability to connect a hose for wash down at unit. • Vendor to provide all MEP services required to provide a fully functioning/code compliant installation. o All new controls to be Siemens and tie into/communicate with existing RIC Facilities Campus BMS. o Provide new ABB Drive (Compatible with RIC Facilities Campus Standards) in lieu of standard drive with new BAC Unit. New Drive to be installed in a NEMA 4 enclosure at the roof unit.