Specifications include, but are not limited to: Removal of debris during dry weather to the water line as shown on the drawings. Dispose of debris at permitted site. Rock debris is generally composed of natural, stone, rock, gravel, boulders, rip rap, concrete pieces that have been displaced and deposited in the channel as indicated on the drawings. Work includes hauling of the removed material to an approved disposal site. Maximum removal dimensions not to exceed 690’ x 8’ x 3’ Sand/Soil/Mud Debris. Removal of trees. The existing vegetation and trees located along the stream banks at the project location shall be protected and maintained to all practicable extents. However, vegetative debris within the channel in the project area and/or trees leaning over the channel within a 35-degree angle off the water surface shall be removed. This project is located in the vicinity of northern long-eared bat spring staging/fall swarming habitat. See specification section 99001.