Specifications include, but are not limited to: The Housing Authority of the Cherokee Nation is seeking bids from qualified contractors for the construction of One (1) turn-key construction of a single 3-bedroom in Muskogee County within the Cherokee Nation Reservation. Interested parties are to provide bids to furnish all necessary labor, quality control, licenses, materials, equipment, tools, supplies, permits, insurance, and supervision to complete the entire project and to perform the work require thereof within the time specified after receipt of the “Notice to Proceed”. CONVENANTS--NO LESS 1100 SQ RESIDENCE, 2 CAR GARAGE ATTACHED. PLAT SUBMITTED. 1 SINGLE FAMILY DWELLING PER LOT, CANNOT SPLIT LOT. 25' front setback. Electric is underground. 12. Contractor will be responsible for final grade of the yard for preparations for sod installation in a 30’ perimeter around house. Final grade material to be topsoil free of large rocks, trash and tree roots and any debris. Topsoil material must be approved by HACN. 13. Contractor responsible for installing Bermuda mix sod in the 30’ perimeter around the home. 14. Utilities: Contractor will be responsible for getting utilities to the site electric, water and sewer. Contractor will be responsible for getting the perc test done. 15. Pad: Pre-Treat slab, footing for wood infestation insects. Spray perimeter around brick after fresh sod is laid and before sod is installed. (see spec book for requirements SECTION 2D) Proof of application must be posted at the site. ORIGINAL termite certificate required from applicator AND SUBMITTED WITH 1ST DRAW REQUEST. An amended Termite Certificate will be required to be submitted with the FINAL draw request. 16. Footing: Shall be 18”x24” with 5/8” rebar using four bars. Footings will be installed under the perimeter walls and shall include under porches with 1” R-Board (foam beaded will not be accepted). Must conform to the requirements of the local building code as adopted by the city in which the work takes place (IF APPLICABLE) and city/state building codes. Porch footing shall be a minimum of 12” X 12” with 4 5/8 rebar. . 17. All concrete will have design mix for 3500 psi compressive strength and shall have an air-entraining admixture to give air content between 5 to 7% volume concrete. A 6-mil polyethylene plastic shall be installed as a waterproof membrane on all units and all cuts and penetrations shall be sealed with tape. 18. Approach: for each unit containing a garage door (3 bedroom with attached garage), a 15’ x 25’ concrete approach shall be constructed. A drop down will be required for the (3) bedroom with attached garage units to prevent water from entering garage. The approach must comply with local/state code. Homes without garages (2- & 4-Bedroom plans) will have a 14’x25’ concrete parking pad at the end of the driveway, include 4’x20’ sidewalk to be installed from the parking pad to the front porch. Porch: a 6’x6’ concrete slab at the back door. Before concrete is poured, a slab inspection must be requested from the local building official and pass inspection. All work must meet the requirements of city/state codes (if applicable). Porches must be poured at the same time as the floor to create monolithic pour. 19. Post-tension cables will be required with approved concrete blueprints, unless contractor supplies a soil sample test. APPROVED CONCRETE BLUEPRINTS MUST BE SIGNED OFF BY HACN CONSTRUCTION MANAGER PRIOR TO BEGINNING PROJECT. 20. Concrete Cylinder: Contractor will take (3) test cylinder per truck: (1) for a 7-day break and (2) for a 28-day break. All test results shall be sent to the office. Attn: Inspector Supervisor and/or Construction Manager. 1 per truck, each footing requires a 28-day break, and each slab requires both a 7 and a 28- day break. 21. Contact HACN Inspector regarding concrete: Footing, when dug and before poured), and Slab (before poured). HACN STAFF SHOULD BE PRESENT.