Specifications include, but are not limited to: A. The Contractor shall provide all necessary elements including but not limited to labor, materials, ladders, test equipment, tools, O&M Manuals and vehicles, required to perform full maintenance service for all the chiller systems (absorption, centrifugal, hermetic chillers, etc.)and their associated isolation and steam control valves, as listed in Section 3.08, SPECIFIC SYSTEMS AND LOCATIONS, of this TECHNICAL SPECIFICATIONS Section, inclusive of all remote or attached component equipment, and as detailed in Sections 1.02, 3.08, and 5.01, of this TECHNICAL SPECIFICATIONS Section B. The Contractor shall be responsible for performing all scheduled maintenance in accordance with the frequencies set forth herein and all maintenance inspections, overhauls and repairs as recommended by the equipment manufacturer. The frequencies stated herein are to be considered minimum requirements under which the Contractor shall perform preventive maintenance.