Specifications include, but are not limited to: A. Project area boundaries are marked with two blue paint slashes. B. Block 1, all hardwood trees/shrubs 1” DBH and over, except for red and blue paint marked trees are to be cut. All conifers are reserved. Hand Cutting only. C. All employees must be able to identify species. D. Usable material may not be removed from site. E. Woody material felled with clean cuts must have stumps that are parallel to the ground surface and shall not exceed six (6) inches in height measured on the side next to the highest ground or the diameter of the stump, whichever is smaller, except when in the opinion of the Field Contract Coordinator, said height is impractical. F. Cut trees must be removed from trails, roads, tail drains, streams, fire breaks, road edges, and utility rights-of-way. There are multiple streams beds in this project area. G. All trees shall be felled so tops do not pile on one another but lie singly on the ground. H. Slash shall be lopped to no higher than 4’ and pulled apart as directed by the Regional Forester. 1. Block 1 has dense pockets of highbush blueberries. Walking to trees that will be felled and lopping of felled trees will be difficult. The soil is also very wet and can make moving about more difficult. I. Operators shall exercise care and caution in all operations to prevent damage to all trees not specified for treatment. J. All tops must be pulled back 25 feet from the State Game Land boundary, (blazed & painted white), all roads, parking lots, herbaceous openings, utility Right of Ways and deer exclosures. Tops, branches, and slash will be removed from all ponds, lakes, and streams. K. Damage to trails, roads, streams, or utility rights-of-way caused by the Operator’s equipment must be repaired by the Operator at their expense. L. Any trash resulting from the Operator’s operations must be removed from the area and properly disposed of. M. The Operator shall not block any roads or trails in the area during performance of this contract. The Operator shall not in any way hinder the progress of any Timber Sale Contracts in these areas. N. All labor, equipment, tools, etc., needed to complete contracted projects are to be provided by the Operator...