Specifications include, but are not limited to: Task 1 – Data Collection – The firm will collect and record all pertinent electrical component field data necessary to create the system model for each of the electrical power distribution systems listed in this RFP. The firm will be accompanied by a Water Filtration Plant employee who has familiarity with the locations of equipment to be included in the assessment. Typical field data may include but is not limited to transformers, switchgear, switchboards, motor control centers, panelboards, circuit breakers, protective relays, fuses, bus ducts, bus plugs, feeder conductors, motors, etc. Task 2 – Model and Perform Electric Power Systems Analysis: The firm will develop a software model of the systems. This model will be used to perform the following studies: A. Short Circuit Current Study (SCCS) in accordance with appropriate standards for all applicable electrical components. This will also include an equipment evaluation study to check the computed available fault current against existing equipment short circuit interrupting ratings. B. Overcurrent Protective Device Coordination Study in accordance with appropriate standards for all applicable electrical components. Graphical plots of each applicable device time current coordination curve will be provided in color on 8.5" x 11" Log-Log scale paper. The study will analyze and optimize protective device settings and provide the lowest possible incident energy while maintaining selective coordination. Emergency systems shall be analyzed for compliance with the NEC sections 620.62 requirements for multiple elevators, 700.27 Emergency Systems and 701.18 Legally Required Stand-by Systems...